 1. Surface preparation: Correct substrate preparation is critical for optimum performance. Substrate should be sound, clean, dry and free from loose particles, oil, grease, and all other contaminants. Sand the concrete floor and then clean the dust. if the floor substrate is porous with obvious cracks, joints,holes, it’s strongly recommended that you mix primer or undercoat with quartz sand/powder to repair areas to reach a flat surface. 

                       

2.It' better not to wash the floor with water, if necessary, you have to wait until the floor is completely dry, or after the application of primer, it will cause bubbles and come-off of the paint film. For more notes before painting,please go to FAQ page.

3. Clear Epoxy Primer.

It is made up of CP-30A and CP-30B.Mix these two components together based on A:B= 1:1 by weight and then apply with roller or flat spatula. The consumption quantity is 0.15kg/sqm. One coat is enough. After application, wait for 8 hours and then continue the next procedure.
                  

4. Epoxy Undercoat.

It is made up of CP-MA (similar color to topcoat) and CP-MB. Mix these two components based on A: B=5:1 by weight and then add quartz powder (40%~50% of the mixture of A and B) into the mixture, stir it well and apply with flat spatula.The consumption quantity of A and B is 0.5kg /sqm. Quartz powder is 0.2~0.25kg/sqm .You can do it one coat at one time or two coats at two times. In the second case, the application interval is about 8 hours at 25 degrees. One person is required to handle the painting of corners and edges.

                

5.Sand /Grind the Undercoat layer,then clean the floor (Small machine for sanding corner and edges)

                    

6.
Self-Leveling Epoxy Topcoat.

It is made up of CP-5000A and CP-5000B. Mix these two components together based on A:B=5:1 and then apply it with Teeth Spatula. Don’t mix the paint too much, 5kg-10kg each time will be better. The consumption quantity is 0.8~1 kg/sqm
                  

7. During the whole application, the room should be well-ventilated. Especially the application of the primer, because it is solvent-based.

8.Maintenance: 7-15 days. Don’t use or wash with water and other chemicals.

If you need further help in application of epoxy paint, please visit the Service page.